DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:12.22 02:47

  • NIGERIA | LAGOS:12.22 03:47

  • EGYPT | CAIRO:12.22 04:47

  • UAE | DUBAI:12.22 06:47

  • SRI LANKA | COLOMBO:12.22 08:17

  • SINGAPORE:12.22 10:47

  • ENGLAND | LONDON:12.22 03:47

  • RUSSIA | MOSCOW:12.22 06:47

  • CHINA | BEIJING:12.22 10:47

  • AMERICA | Los Angels:12.21 19:47

  • AMERICA | New York:12.21 22:47

  • BRAZIL | San Paulo:12.21 23:47