DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:10.30 18:44

  • NIGERIA | LAGOS:10.30 19:44

  • EGYPT | CAIRO:10.30 20:44

  • UAE | DUBAI:10.30 22:44

  • SRI LANKA | COLOMBO:10.31 00:14

  • SINGAPORE:10.31 02:44

  • ENGLAND | LONDON:10.30 19:44

  • RUSSIA | MOSCOW:10.30 22:44

  • CHINA | BEIJING:10.31 02:44

  • AMERICA | Los Angels:10.30 11:44

  • AMERICA | New York:10.30 14:44

  • BRAZIL | San Paulo:10.30 15:44