DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:03.14 06:48

  • NIGERIA | LAGOS:03.14 07:48

  • EGYPT | CAIRO:03.14 08:48

  • UAE | DUBAI:03.14 10:48

  • SRI LANKA | COLOMBO:03.14 12:18

  • SINGAPORE:03.14 14:48

  • ENGLAND | LONDON:03.14 07:48

  • RUSSIA | MOSCOW:03.14 10:48

  • CHINA | BEIJING:03.14 14:48

  • AMERICA | Los Angels:03.13 23:48

  • AMERICA | New York:03.14 02:48

  • BRAZIL | San Paulo:03.14 03:48