Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:06.08 01:40
NIGERIA | LAGOS:06.08 02:40
EGYPT | CAIRO:06.08 03:40
UAE | DUBAI:06.08 05:40
SRI LANKA | COLOMBO:06.08 07:10
SINGAPORE:06.08 09:40
ENGLAND | LONDON:06.08 02:40
RUSSIA | MOSCOW:06.08 05:40
CHINA | BEIJING:06.08 09:40
AMERICA | Los Angels:06.07 18:40
AMERICA | New York:06.07 21:40
BRAZIL | San Paulo:06.07 22:40