Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:10.30 22:40
NIGERIA | LAGOS:10.30 23:40
EGYPT | CAIRO:10.31 00:40
UAE | DUBAI:10.31 02:40
SRI LANKA | COLOMBO:10.31 04:10
SINGAPORE:10.31 06:40
ENGLAND | LONDON:10.30 23:40
RUSSIA | MOSCOW:10.31 02:40
CHINA | BEIJING:10.31 06:40
AMERICA | Los Angels:10.30 15:40
AMERICA | New York:10.30 18:40
BRAZIL | San Paulo:10.30 19:40