The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:12.21 21:14
NIGERIA | LAGOS:12.21 22:14
EGYPT | CAIRO:12.21 23:14
UAE | DUBAI:12.22 01:14
SRI LANKA | COLOMBO:12.22 02:44
SINGAPORE:12.22 05:14
ENGLAND | LONDON:12.21 22:14
RUSSIA | MOSCOW:12.22 01:14
CHINA | BEIJING:12.22 05:14
AMERICA | Los Angels:12.21 14:14
AMERICA | New York:12.21 17:14
BRAZIL | San Paulo:12.21 18:14