The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:06.07 20:33
NIGERIA | LAGOS:06.07 21:33
EGYPT | CAIRO:06.07 22:33
UAE | DUBAI:06.08 00:33
SRI LANKA | COLOMBO:06.08 02:03
SINGAPORE:06.08 04:33
ENGLAND | LONDON:06.07 21:33
RUSSIA | MOSCOW:06.08 00:33
CHINA | BEIJING:06.08 04:33
AMERICA | Los Angels:06.07 13:33
AMERICA | New York:06.07 16:33
BRAZIL | San Paulo:06.07 17:33