DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-08-05

 

 

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:09.19 03:42

  • NIGERIA | LAGOS:09.19 04:42

  • EGYPT | CAIRO:09.19 05:42

  • UAE | DUBAI:09.19 07:42

  • SRI LANKA | COLOMBO:09.19 09:12

  • SINGAPORE:09.19 11:42

  • ENGLAND | LONDON:09.19 04:42

  • RUSSIA | MOSCOW:09.19 07:42

  • CHINA | BEIJING:09.19 11:42

  • AMERICA | Los Angels:09.18 20:42

  • AMERICA | New York:09.18 23:42

  • BRAZIL | San Paulo:09.19 00:42