The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:09.19 03:42
NIGERIA | LAGOS:09.19 04:42
EGYPT | CAIRO:09.19 05:42
UAE | DUBAI:09.19 07:42
SRI LANKA | COLOMBO:09.19 09:12
SINGAPORE:09.19 11:42
ENGLAND | LONDON:09.19 04:42
RUSSIA | MOSCOW:09.19 07:42
CHINA | BEIJING:09.19 11:42
AMERICA | Los Angels:09.18 20:42
AMERICA | New York:09.18 23:42
BRAZIL | San Paulo:09.19 00:42