The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:01.01 13:11
NIGERIA | LAGOS:01.01 14:11
EGYPT | CAIRO:01.01 15:11
UAE | DUBAI:01.01 17:11
SRI LANKA | COLOMBO:01.01 18:41
SINGAPORE:01.01 21:11
ENGLAND | LONDON:01.01 14:11
RUSSIA | MOSCOW:01.01 17:11
CHINA | BEIJING:01.01 21:11
AMERICA | Los Angels:01.01 06:11
AMERICA | New York:01.01 09:11
BRAZIL | San Paulo:01.01 10:11