DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-08-05

 

 

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:11.01 19:32

  • NIGERIA | LAGOS:11.01 20:32

  • EGYPT | CAIRO:11.01 21:32

  • UAE | DUBAI:11.01 23:32

  • SRI LANKA | COLOMBO:11.02 01:02

  • SINGAPORE:11.02 03:32

  • ENGLAND | LONDON:11.01 20:32

  • RUSSIA | MOSCOW:11.01 23:32

  • CHINA | BEIJING:11.02 03:32

  • AMERICA | Los Angels:11.01 12:32

  • AMERICA | New York:11.01 15:32

  • BRAZIL | San Paulo:11.01 16:32