The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:11.01 19:32
NIGERIA | LAGOS:11.01 20:32
EGYPT | CAIRO:11.01 21:32
UAE | DUBAI:11.01 23:32
SRI LANKA | COLOMBO:11.02 01:02
SINGAPORE:11.02 03:32
ENGLAND | LONDON:11.01 20:32
RUSSIA | MOSCOW:11.01 23:32
CHINA | BEIJING:11.02 03:32
AMERICA | Los Angels:11.01 12:32
AMERICA | New York:11.01 15:32
BRAZIL | San Paulo:11.01 16:32