DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-08-05

 

 

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:07.03 03:23

  • NIGERIA | LAGOS:07.03 04:23

  • EGYPT | CAIRO:07.03 05:23

  • UAE | DUBAI:07.03 07:23

  • SRI LANKA | COLOMBO:07.03 08:53

  • SINGAPORE:07.03 11:23

  • ENGLAND | LONDON:07.03 04:23

  • RUSSIA | MOSCOW:07.03 07:23

  • CHINA | BEIJING:07.03 11:23

  • AMERICA | Los Angels:07.02 20:23

  • AMERICA | New York:07.02 23:23

  • BRAZIL | San Paulo:07.03 00:23