DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-08-05

 

 

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:06.07 20:33

  • NIGERIA | LAGOS:06.07 21:33

  • EGYPT | CAIRO:06.07 22:33

  • UAE | DUBAI:06.08 00:33

  • SRI LANKA | COLOMBO:06.08 02:03

  • SINGAPORE:06.08 04:33

  • ENGLAND | LONDON:06.07 21:33

  • RUSSIA | MOSCOW:06.08 00:33

  • CHINA | BEIJING:06.08 04:33

  • AMERICA | Los Angels:06.07 13:33

  • AMERICA | New York:06.07 16:33

  • BRAZIL | San Paulo:06.07 17:33