The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:07.03 03:23
NIGERIA | LAGOS:07.03 04:23
EGYPT | CAIRO:07.03 05:23
UAE | DUBAI:07.03 07:23
SRI LANKA | COLOMBO:07.03 08:53
SINGAPORE:07.03 11:23
ENGLAND | LONDON:07.03 04:23
RUSSIA | MOSCOW:07.03 07:23
CHINA | BEIJING:07.03 11:23
AMERICA | Los Angels:07.02 20:23
AMERICA | New York:07.02 23:23
BRAZIL | San Paulo:07.03 00:23